(TANJUNG JATI B COAL FIRED POWER PLANT UNIT 1&2)
This project include production and installation of tetrapods at Shoreline Area Tanjung Jati B Unit 1 & 2 Power Plan that aim to prevent erosion caused by sea waves. The production utilizing FABA waste with a certain composition that passes the compressive strength test laboratory by the value of K-400. Distribution of tetrapods from the production area to installation locations and installation of tentrapods by the support of 50 ton truck mounted crane.